Dunston, P S and Wang, X (2005) Mixed Reality-Based Visualization Interfaces for Architecture, Engineering, and Construction Industry. Journal of Construction Engineering and Management, 131(12), 1301–9.

El-Rayes, K and Hyari, K (2005) Optimal Lighting Arrangements for Nighttime Highway Construction Projects. Journal of Construction Engineering and Management, 131(12), 1292–300.

Ibbs, W and Liu, M (2005) Improved Measured Mile Analysis Technique. Journal of Construction Engineering and Management, 131(12), 1249–56.

  • Type: Journal Article
  • Keywords: Construction management; Claims; Productivity; Statistics; Project management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1249)
  • Abstract:
    Quantifying lost labor productivity on construction projects is difficult and sometimes subjective. A widely accepted way to quantify losses is the “measured mile” approach. It compares periods of a project that have been impacted by change to those that have not been impacted. As currently practiced the measured mile relies on subjectively identifying that reference period. In this paper the measured mile and a variant, the baseline method, are analyzed and compared to a new, proposed statistical clustering method. This new approach is advocated because it determines its reference period using objective criteria. A case study is included to show how the three methods work, and advantages and disadvantages of each method are presented in this paper.

Irizarry, J, Simonsen, K L and Abraham, D M (2005) Effect of Safety and Environmental Variables on Task Durations in Steel Erection. Journal of Construction Engineering and Management, 131(12), 1310–9.

Lee, E, Harvey, J T and Thomas, D (2005) Integrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction. Journal of Construction Engineering and Management, 131(12), 1283–91.

Nassar, K M, Gunnarsson, H G and Hegab, M Y (2005) Using Weibull Analysis for Evaluation of Cost and Schedule Performance. Journal of Construction Engineering and Management, 131(12), 1257–62.

Navon, R and Berkovich, O (2005) Development and On-Site Evaluation of an Automated Materials Management and Control Model. Journal of Construction Engineering and Management, 131(12), 1328–36.

Pulaski, M H and Horman, M J (2005) Continuous Value Enhancement Process. Journal of Construction Engineering and Management, 131(12), 1274–82.

Shapira, A and Goldenberg, M (2005) AHP-Based Equipment Selection Model for Construction Projects. Journal of Construction Engineering and Management, 131(12), 1263–73.

Uwakweh, B O (2005) Effect of Foremen on Construction Apprentice. Journal of Construction Engineering and Management, 131(12), 1320–7.